Soft-Story Seismic Retrofit – City of West Hollywood

Overview

The City of West Hollywood officially implemented a seismic retrofit program on April 17, 2017. This program was created to reduce earthquake-related risks and improve life safety for occupants of commercial and multifamily buildings throughout the city. Ordinance 17-1004 outlines the mandatory requirements for strengthening existing wood-frame buildings that have soft, weak, or open-front walls. It also includes requirements related to cripple walls and sill plate anchorage in older wood-frame structures. The ordinance went into effect on April 1, 2018.

  • Priority I: Buildings with 16 or more dwelling units
  • Priority II: Buildings with 3 or more stories and fewer than 16 dwelling units
  • Priority III: Buildings that do not fall under Priority I or Priority II

Milestones

Beverly Hills sorted affected buildings into three tiers, each with its own deadline schedule:

Begin Process

Notice of the program is served to the building owner

1 Year After Notice

Deadline to submit the screening report

2 Years After Notice

Deadline to submit retrofit plans

4 Years After Notice

Deadline to obtain permits and begin construction

5 Years After Notice

Deadline to complete the retrofit construction

  • Full structural assessment
  • Identification of SWOF lines
  • Determination of “Retrofit Required” or “Exempt”
  • Engineering justification for exemption requests
  • Posting guidance for required signage
Fully compliant with Burbank Seismic Design Guidelines, including:
Owners may recover up to 50% of construction costs (max $51/unit/month for up to 120 months).

Frequently Asked Questions

Does every older building in West Hollywood need a retrofit?
No. The ordinance applies to wood-frame buildings with soft, weak, or open-front wall conditions, typically multi-story structures with tuck-under parking or large ground-floor openings. The screening report is what confirms whether your specific building requires retrofit.
A screening report prepared by a California-licensed Civil or Structural Engineer. This must be submitted within 1 year of your Notice.
Possibly. The screening report evaluates whether your building meets the SWOF criteria or whether a prior retrofit already satisfies current requirements.
California-licensed Civil or Structural Engineers.
The City can issue fines, pursue enforcement actions, and record violations against the property. Extensions are limited and must be justified.
Yes. West Hollywood has a rent stabilization program and specific rules governing tenant notification and habitability during construction. Work with the City’s Rent Stabilization Division for the current requirements that apply to your project.
Priority I covers buildings with 16 or more dwelling units. Priority II covers buildings with 3 or more stories and fewer than 16 units. Priority III covers everything else that qualifies under the ordinance.

Get Started

Whether you’ve just received a Notice from West Hollywood or you want to get ahead of the program, OC Structural manages the full engineering scope, screening, retrofit design, permit coordination, and construction support. Reach out for a free consultation and we’ll tell you exactly where your building stands.