Soft-Story Seismic Retrofit – City of Culver

What do I need to do?

OC Structural Engineering provides complete engineering support throughout all phases of the retrofit process:

Screening Report

Retrofit Plans

Permit and Start Construction

Complete Construction

Professional Engineering, Screening Reports, Retrofit Plans & Permit Support

Soft-story buildings in Culver City are now required to comply with Ordinance 2021-013, which mandates seismic evaluation and strengthening of wood-frame structures with soft, weak, or open-front wall lines (SWOF). OC Structural Engineering provides a full, end-to-end engineering solution to help property owners meet every required milestone from initial screening to final approval from the City.

Quick summary for property owners

Does my building need to comply

Your building is likely part of Culver City’s soft-story program if it:
Single-family homes and accessory dwelling units are exempt .If you received a Notice to Comply from Culver City, your building is officially in the program.

How long do I have?

All deadlines are measured from the date on your Notice to Comply, not from the year the ordinance was adopted.

How OC Structural Engineering helps

We handle the engineering side of compliance, including:

Under Ordinance 2021-013, Culver City requires evaluation and strengthening of certain wood-frame buildings with soft, weak, or open-front wall lines. These buildings are known to perform poorly in earthquakes because the ground level lacks sufficient lateral strength and stiffness.

Buildings included in the program

A building falls under this program if it:

Exempt building types include single-family homes and accessory dwelling units.

Priority groups and notice dates

Culver City assigned compliance priority based on building size and configuration:
Priority I
Priority II
Priority III
Your actual deadlines are keyed to your building’s specific Notice to Comply date.
1. Screening report – due 1 year after Notice to Comply

A licensed Civil or Structural Engineer performs a structural evaluation and prepares a Screening Report to determine whether:

The screening typically includes:
If the building is documented as exempt, no retrofit is required under this ordinance.
2. Retrofit plans – due 2 years after Notice to Comply

If the screening indicates that retrofit is required, the owner must submit a complete retrofit plan set, which generally includes:

3. Obtain permit and start construction – due 3–4 years after Notice

After the City approves the retrofit plans:

4. Complete construction – due 5 years after Notice

To satisfy the ordinance, the work must be completed and:

Screening reports

OC Structural Engineering provides:

Retrofit plan sets

Our retrofit plans are prepared to meet Culver City’s SWOF requirements and typical reviewer expectations, and may include:

Permit and plan-check support

We assist owners and contractors with the plan-check and permit process by:

Construction support

During construction, OC Structural can provide:

Soft-story buildings are vulnerable to earthquake damage because the ground floor often has much less strength and stiffness than the levels above. Common issues include:

These conditions can lead to excessive drift, localized failures, or collapse of the lower story during a strong earthquake. The Culver City ordinance is intended to reduce these risks, protect occupants, and preserve the city’s housing stock.

Culver City reviewers typically look for:

Tenant notification and Housing Division requirements

For occupied buildings, Culver City may require:

OC Structural can assist with the engineering-related portions of these requirements and coordinate with property managers and ownership teams.

Capital improvement pass-through (optional for owners)

Culver City may allow owners to recover a portion of eligible retrofit costs through regulated rent increases, subject to:

We can help document engineering and design-related expenses as part of an owner’s larger pass-through strategy.

Frequently Asked Questions

I received a notice from Culver City. What does it mean?
It means your building was officially identified under Culver City Ordinance 2021-013 as a wood-frame structure with Soft, Weak, or Open-Front (SWOF) wall lines. You are required to complete a Screening Report and follow the compliance timeline.

Not necessarily. It means your building has characteristics that make it more vulnerable during earthquakes.

The purpose of the program is to evaluate the condition and, if needed, strengthen the building to reduce collapse risks.

Your building is included if it meets all of the following:

  • Wood-frame
  • Two or more stories
  • Ground-floor parking or large openings
  • Built before October 23, 1978
  • Identified with SWOF wall lines

These are the classic “tuck-under parking” or “open-front” soft-story structures.

The first required step is the Screening Report, prepared by a licensed Civil or Structural Engineer. This determines:

  • Exempt → no retrofit needed
  • Retrofit Required → proceed to engineering plans

You have 1 year from the date your Notice to Comply was issued.

This is very important:Your timeline is based on your specific notice date, not the ordinance adoption year.

If your building needs retrofit:

  • Retrofit Plans – due 2 years from notice
  • Obtain Permit & Start Construction – by year 3–4
  • Complete Construction – by year 5

If your building is exempt, the engineer indicates this in the Screening Report and no further retrofit action is required.

Yes, your engineer may determine your building:

  • does not meet SWOF criteria,
  • or was previously strengthened
  • or is structured in a way that does not trigger ordinance requirements

If exempt, the Screening Report documents this for the City.

Typical plan sets include:

  • Site plan & architectural sheets
  • SWOF identification
  • Shear wall & moment frame design
  • Foundation upgrades
  • Diaphragm analysis
  • Collector/drag strut detailing
  • Structural calculations
  • Required Culver City notes
  • Tenant Impact Mitigation Plan (if applicable)

This is prepared by your engineer and submitted for plan check.

  • Contractor pulls permit
  • Engineer performs required structural observations
  • City performs inspections
  • The project must receive final approval within 5 years of your notice date

Engineering costs are fairly predictable, but construction costs vary widely depending on:

  • Size of building
  • Number of openings
  • Foundation condition
  • Retrofit type selected (moment frame vs shear wall, etc.)

We can evaluate this after reviewing your screening results.

  • Screening: Usually quick
  • Retrofit plans: Typically a few weeks once site access is granted

We provide timelines immediately after initial review.

Just send us your Notice to Comply (a photo is fine).
We’ll tell you:

  • your deadlines
  • your compliance category
  • and exactly what needs to happen next

Get Started

Whether your building received a Notice to Comply or you want to begin the process proactively, OC Structural Engineering is ready to manage the entire engineering scope from start to finish.