Soft-Story Seismic Retrofit – City of Torrance
Overview
The City of Torrance adopted Seismic Retrofit Ordinance No. 3916 (approved March 14, 2023), initiating a mandatory program to strengthen older, potentially vulnerable buildings. The ordinance addresses multiple at-risk building types, including wood soft-story structures.
These buildings were constructed under older design standards and present a higher risk of severe damage or collapse during large earthquakes. The City is currently preparing the implementation phase. Compliance notices and deadlines have not yet been issued.
Program Status
- Ordinance adopted
- Applicability determined
- Implementation & Notice to Owners: Pending
- Compliance deadlines: Not released yet
What Types of Buildings Are Affected?
Existing Wood-Frame Soft, Weak, or Open-Front Wall Buildings
- Multi-story wood buildings where the ground floor is significantly more flexible than upper floors
- Typically caused by:
- Large open parking areas
- Lack of shear walls
- Open-front commercial bays
- Common in pre-1980s construction
- Highly vulnerable to collapse during strong shaking
City of Torrance – Program Milestones
As of now:
- No screening forms are required
- No engineering analysis deadlines
- No retrofit submission deadlines
- No construction deadlines
What Socalstructural Engineering Provides in Torrance
- Structural evaluation
- Identification of soft/weak/open-front lines
- Determination of retrofit needs
- Pre-Notice voluntary screening
- Lateral analysis & calculations
- Soft-story strengthening design
- Foundation/collector/diaphragm upgrades
- Cantilever column systems
- Full construction details
- Plan check responses
- Structural observation
- Final inspection coordination
- Notice templates
- Construction scheduling coordination
Learn More About the Torrance Retrofit Program
Soft-story wood buildings often fail at the ground level due to:
- Open parking (tuck-under)
- Lack of braced walls
- Owners will be assigned deadlines to submit engineering evaluations or plans.
- Buildings confirmed as vulnerable will require full seismic retrofit plans.
- Construction permits must be obtained and retrofit work completed by the deadlines specified in the notice.
- Up to $13,000 toward soft-story retrofits for eligible homes
- All Torrance ZIP codes qualify
- Administered by the California Residential Mitigation Program (CRMP)
Frequently Asked Questions
Have compliance deadlines been issued?
Does my multi-family building require a retrofit?
If it meets any of these:
- Wood-frame
- Multiple stories
- Open parking or commercial space at ground level
- Built prior to modern seismic codes
…then it is likely included under Ordinance No. 3916.
Will owners receive an official Notice?
Yes. Retrofits only become mandatory after the City issues formal Notice-to-Owner letters.
Can retrofit costs be passed to tenants?
What if I want to start early?
Owners may voluntarily begin:
- Engineering evaluations
- Preliminary structural assessments
- Soft-story retrofit design concepts
Socal Structural can assist with early assessments so owners are ahead of future deadlines.