Long Beach Soft-Story Retrofit Services
What do I need to do?
Soft-Story Screening
- Complete the Screening (Form 062)
- A licensed engineer inspects your building and submits Form 062 to the City.
If needed → Prepare Retrofit Plans
- If your building is not exempt, a full retrofit engineering plan set must be submitted.
Retrofit Construction
- Contractor pulls the permit, performs the work, and the project receives final approval
Quick Summary for Property Owners
Does my building need soft story retrofit?
You must comply if your building is:
- Wood-framed
- Built before 1978
- Two stories or more
- Has tuck-under parking or open areas at the ground level
- Identified by the City as a potential Soft, Weak, or Open-Front (SWOF) building
How long do I have?
How Socal helps:
We handle everything:
- Engineering inspection
- Form 062
- Form 063 (exemption, if applicable)
- Retrofit engineering plans
- City submittals & corrections
- Structural observation during construction
- Final sign-off support
Learn More About The Process
Long Beach is developing a Building Seismic Resiliency Program to reduce the risk of older wood-frame buildings collapsing during earthquakes. According to City documents, thousands of residential units are in buildings built before 1978 that may have Soft, Weak, or Open-Front (SWOF) wall lines.
Buildings that must comply include:
- Wood-frame buildings
- Built before January 1, 1978
- Two or more stories
- Contain tuck-under parking or large ground-floor openings
- One or more floors located above an open floor line
These buildings are vulnerable because the lowest level lacks the lateral strength needed to resist earthquake forces.
Your Notice to Comply = Your Deadline Clock
The deadlines do not start when the ordinance began. They start from the exact date printed on your building’s Initial Notification Letter
- Hire a licensed engineer
- Have the building evaluated
- Submit Form 062 within 360 days of the notice date
- This form is used to confirm:
- Whether your building is truly a SWOF
- Whether previous strengthening already eliminated the condition
- Whether inventory details need correction
If your building is exempt:
The engineer will submit Form 063 and the building is removed from the list.
If retrofit is required:
You proceed to full engineering plans
Property owners must follow the required timeline once an Order to Comply is issued.
Step 1: Hire a licensed civil or structural engineer to prepare the retrofit plans.
Step 2: Submit retrofit plans or acceptable documentation within 2 years.
Step 3: Obtain a building permit no later than 3.5 years from the date on the Order to Comply.
Step 4: Complete retrofit construction within 7 years.
LADBS performs plan review and inspections throughout the process.
Owners must comply with all THP requirements administered by LAHD (Los Angeles Housing Department). This plan may include temporary relocation requirements, sequencing of work, and access to occupied units. Owners must comply with all THP processes outlined by the City.
- Structural calculations and retrofit drawings
- Wall-line strengthening details
- Foundation and anchorage details
- Diaphragm and collector upgrades
Certain retrofit systems require formal structural observation by the design professional.
Observations typically occur at critical stages such as:
- Foundation preparation and anchorage
- Moment frame placement
- Shear wall installation
- Collector and diaphragm connections
Frequently Asked Questions
I received a letter from the City. What does it mean?
Does this mean my building is unsafe right now?
Not necessarily. It means your building may be more vulnerable to earthquake damage compared to newer buildings or those that have already been strengthened. The screening step is meant to understand your actual condition and confirm the City’s inventory.
Is this the same as “soft-story retrofit”?
How do I know if my building is part of the program?
What is Form 062 and why do I need it?
Form 062 is the Soft-Story Screening Form. A property owner (and in many cases an engineer) uses it to:
- Confirm the City’s information
- Indicate if previous strengthening has already been done
- Help the City finalize its list of soft-story buildings
It’s the City’s way of cleaning and confirming the SWOF inventory.
What is Form 063?
Form 063 is the Request for Removal Form. It is prepared and signed by a licensed design professional if:
- The building has already been properly strengthened, or
- The building does not actually meet the definition of a SWOF building
If accepted, your building is removed from the SWOF inventory.
Is retrofit mandatory in Long Beach right now?
The City is currently in the inventory and outreach phase and is updating its program for SWOF buildings. Responding to the City and screening your building is part of that process. Seismic strengthening is strongly encouraged and may become more formalized or mandatory in the future as the program develops.
How long does this process take?
What does Socal Structural do vs. what the contractor does?
1. Socal Engineering:
- Evaluates your building
- Completes Form 062 and, if applicable, Form 063
- Prepares seismic retrofit plans and calculations
- Responds to City plan-check comments
- Provides structural observations during construction
2. Contractor:
- Performs the actual construction work
- Pulls the building permit
- Coordinates with our office and City inspectors during construction
Can you look at my City letter and tell me what to do next?
Yes. You can send us a copy of your Notice / Initial Notification Letter, and we’ll:
- Explain what the City is asking for
- Confirm which forms you need
- Outline the recommended next steps and a proposed scope of work